Browsing Category
Archive

In the 6th part the last part of the ceiling has been shuttered and the iron mat is finished by hand before the concrete can be made. Now the concrete has to dry and the mason can start to build the outer walls. The formwork is removed and the ceiling is now finished in its basic. Now we have a better overview of the size and the layout of the 2nd floor.

Share:
Reading time: 1 min